For many businesses, electricity is one of those expenses that keeps coming back every month. Whether you run a manufacturing unit, a commercial facility, or an industrial operation, power costs have a direct impact on day-to-day business expenses.

This is one reason more businesses are exploring solar power—not just as an environmental initiative, but as part of their long-term energy planning.

But what if your factory roof is not large enough for a solar installation? What if you have unused land near your industrial unit? Or what if you want to develop a solar power plant without being the actual consumer of all the electricity it generates?

This is where a ground-mounted solar power plant comes into the picture.

Unlike rooftop solar, a ground-mounted system is installed on land using specially designed mounting structures. Depending on the project, it can be developed for industrial captive consumption, electricity sales to a DISCOM, or supplying power to an eligible third-party consumer.

At GRE Renew Enertech Limited, we work with ground-mounted solar EPC and solar park requirements, helping customers explore projects based on their land, energy requirements, and commercial objectives.

In this guide, let’s understand how ground-mounted solar works, what businesses should consider before developing a project, and the different ways a solar power plant can be used.

What is a ground-mounted solar power plant?

A ground-mounted solar power plant is a solar electricity generation system installed directly on land rather than on the roof of a building.

Solar panels are fixed onto mounting structures, arranged in rows, and connected to electrical equipment that converts the generated electricity into usable power.

The size of a project can vary considerably. A plant may be developed to meet the energy needs of an individual industrial consumer or as part of a larger solar park intended for supplying electricity to a grid or eligible power buyer.

What makes ground-mounted solar particularly relevant for businesses is the flexibility it offers in choosing the location, plant layout, and project capacity, provided suitable land and electrical infrastructure are available.

For an industrial unit, the land could be near the factory or at another eligible location with an approved electricity supply arrangement. For a solar developer, the project may be designed around the availability of land, grid connectivity, and an identified power buyer.

In simple terms, ground-mounted solar is not limited to one type of customer or one way of using electricity. The right project structure depends on what you want to achieve.

Why are industries considering ground-mounted solar?

Every industrial unit has a different electricity consumption pattern. A manufacturing plant running multiple shifts may have very different requirements from a warehouse or a commercial building.

That is why solar planning should begin with the business’s actual energy requirements rather than simply deciding how many solar panels can fit on a piece of land.

For many industrial consumers, the main objective is to evaluate whether solar generation can reduce their dependence on conventional electricity procurement and improve long-term cost planning.

Here are a few reasons businesses explore ground-mounted solar.

1. Making use of available land

Industrial units sometimes have open land within their premises or access to a suitable nearby land parcel. If the land has appropriate conditions and grid connectivity can be arranged, it may provide an opportunity to install a solar power plant.

Unlike rooftop solar, a ground-mounted project does not depend on the load-bearing capacity or usable area of an existing factory roof.

However, not every open plot is suitable for solar development. Land title, terrain, soil conditions, drainage, access, land-use permissions, and grid connectivity all need to be evaluated.

2. Planning electricity expenses over the long term

Electricity tariffs, operating costs, and business energy requirements can change over time. Businesses therefore look at solar power as one part of a broader energy procurement strategy.

A captive solar power plant may help an eligible consumer offset part of its electricity requirement with solar generation. A third-party power purchase agreement may provide another route for an eligible consumer to procure solar electricity without owning the plant.

The actual financial benefit depends on the project cost, electricity tariff, solar generation, applicable charges, financing, and contractual terms. A feasibility study is necessary before estimating savings.

3. Supporting business sustainability goals

Industrial customers are increasingly interested in understanding the source of their electricity and measuring the environmental impact of their operations.

A solar power plant can contribute to renewable electricity generation. The actual environmental benefit should be calculated using verified generation data and an appropriate emissions factor, rather than relying on a general percentage reduction claim.

For businesses reporting sustainability performance, reliable generation and consumption records are important.

Ground-mounted solar vs rooftop solar: What is the difference?

Both systems generate electricity from sunlight, but the way they are planned and installed is different.

Factor

Ground-mounted solar

Rooftop solar

Installation area

Suitable open land

Available rooftop area

Site requirements

Land, foundations, access and grid connectivity

Roof condition, structural capacity and roof access

Project capacity

Depends on usable land and electrical infrastructure

Depends on usable roof area and electrical infrastructure

Typical applications

Industrial captive plants, solar parks, eligible power sale projects

Factory, commercial building and institutional electricity consumption

Key considerations

Land permissions, soil, layout, evacuation and connectivity

Roof strength, waterproofing, shading and existing equipment

Neither system is automatically suitable for every business. A factory with a large, structurally suitable roof may be able to use rooftop solar, while a business with available land may consider a ground-mounted installation.

In some cases, businesses may evaluate both options as part of the same energy strategy.

The important thing is to compare the available area, expected generation, installation costs, electrical arrangements, and project requirements before deciding.

Three ways to develop a ground-mounted solar power plant

One of the first questions a business should answer is simple: Who will use the electricity generated by the plant?

The answer determines the project’s commercial structure. Ground-mounted solar projects are commonly explored under captive consumption, power sale to DISCOMs, and third-party power supply arrangements.

These models serve different purposes and have different technical, financial, and regulatory requirements.

1. Captive solar power plant for your own business

Suppose you operate a manufacturing unit and have access to suitable land for a solar installation.

Instead of using that land for another purpose, you may evaluate developing a captive solar power plant to meet part of your factory’s electricity demand.

Under a captive arrangement, the eligible consumer or group of consumers must satisfy the applicable ownership and consumption requirements.

The project generally involves:

  • Understanding the factory’s electricity consumption and operating pattern.

  • Evaluating the available land and proposed solar plant capacity.

  • Assessing the electrical infrastructure and approved supply arrangement.

  • Estimating the project cost, expected generation, and commercial feasibility.

For a factory owner, the objective is to determine whether the cost of generating or procuring solar electricity compares favourably with the existing electricity supply arrangement.

A captive plant may be located at the consumer’s premises or at another eligible site, depending on the applicable arrangement and approvals.

For businesses that do not want to invest directly in a solar power plant, a third-party PPA may also be worth evaluating.

2. Ground-mounted solar plant for sale to DISCOM

Another approach is to develop a solar power plant for supplying electricity to a distribution company (DISCOM).

In this model, the project is planned around an eligible power procurement arrangement, such as a tender or power purchase agreement.

A developer or investor needs to evaluate several factors before proceeding:

  • Is there an applicable procurement opportunity or power purchase arrangement?

  • What are the requirements for project capacity, commissioning, and grid connectivity?

  • What tariff, payment terms, and contractual conditions apply?

  • What are the project development costs and expected operating expenses?

The answers will vary from one project to another.

Developing a solar plant does not automatically mean that a DISCOM will purchase its electricity. Procurement eligibility, contractual arrangements, connectivity, and required approvals must be established before the project is treated as a viable power sale opportunity.

For investors, this distinction is important. The project’s economics depend on the actual agreement and project assumptions, not simply on the amount of electricity the panels are expected to generate.

3. Third-party solar power plant for supplying electricity to industries

A third-party solar project involves a power producer supplying electricity to an eligible industrial or commercial consumer under a power purchase agreement and an applicable electricity supply arrangement.

This can be relevant to a factory that wants to procure solar electricity but does not want to develop and own the generation plant itself.

Here is how the arrangement generally works:

  1. A solar developer evaluates the land, proposed capacity, grid connectivity, and potential power buyer.

  2. The solar power plant is developed under the applicable project structure.

  3. The eligible consumer and power producer enter into a power purchase agreement.

  4. Electricity is supplied through the applicable grid and open-access framework, subject to approvals and charges.

For the industrial consumer, the commercial question is whether the agreed solar tariff, together with applicable additional charges, compares with the existing electricity procurement cost.

For the developer, the focus is on project cost, the power purchase agreement, payment terms, generation, and regulatory compliance.

A PPA should clearly establish the commercial responsibilities of the parties, including the agreed tariff, tenure, payment terms, and other applicable conditions.

These arrangements need to be assessed on a project-specific basis.

 

What should you check before developing a solar park?

Having land is a starting point, but it is not enough to establish whether a ground-mounted solar project can be developed successfully.

A proper feasibility assessment helps identify potential issues before substantial money is committed to the project.

Land and site conditions

The first step is to understand the actual usable area of the land.

A plot may appear large enough on paper, but the final plant layout can be affected by its shape, access roads, drainage, uneven terrain, nearby obstructions, and space needed for electrical equipment.

Soil conditions also matter because the mounting structure and foundation design need to suit the site.

Before proceeding, check:

  • Land ownership or lease documentation.

  • Land-use permissions and applicable restrictions.

  • Soil conditions and topography.

  • Access for construction equipment and transportation.

  • Drainage and site development requirements.

The land requirement per MW should be determined from the preliminary engineering layout. There is no single land-area figure that applies to every ground-mounted solar project.

Grid connectivity and evacuation infrastructure

A solar power plant needs a suitable electrical connection to deliver its generated electricity to the intended consumer or grid.

This is an important part of ground-mounted solar project planning, particularly for projects located away from existing electrical infrastructure.

The developer needs to evaluate the relevant grid connection point, evacuation arrangements, connectivity approvals, and associated costs.

In Gujarat, project requirements may involve relevant state transmission or distribution entities and other authorities, depending on the location, voltage level, and project structure.

Grid connectivity should be evaluated early because it can affect the project’s technical feasibility, cost, and development schedule.

Project capacity and expected generation

The proposed capacity should be based on the project’s objective.

For an industrial captive plant, the electricity consumption profile of the factory is an important input. For a power sale project, the proposed capacity needs to be considered alongside the contractual arrangement, grid capacity, and expected electricity generation.

Expected generation depends on factors such as:

  • Solar irradiation at the project location.

  • Module technology and system configuration.

  • Panel orientation, tilt, and shading.

  • Inverter performance and electrical losses.

  • Weather, plant availability, and maintenance.

A generation estimate should be prepared using appropriate technical assumptions and site-specific information. Actual generation will vary with operating and weather conditions.

Project cost and financial feasibility

The total cost of a ground-mounted solar power plant includes more than the solar panels.

Depending on the project, costs may include solar modules, inverters, mounting structures, foundations, civil works, electrical equipment, transmission infrastructure, land development, approvals, financing, and operations and maintenance.

For a commercial assessment, these costs should be compared with the expected project revenues or electricity cost savings under the intended business model.

Investors should also examine the assumptions used in financial projections, including generation, tariff, operating costs, financing, payment terms, and potential changes in applicable charges.

A solar project proposal should explain its assumptions clearly rather than relying on a headline return figure.

What does a turnkey solar EPC company actually do?

For a business developing a ground-mounted solar power plant for the first time, coordinating every stage of the project can be complicated.

Engineering, equipment procurement, civil works, electrical installation, testing, and commissioning involve different technical requirements. This is where a turnkey solar EPC company can support the project.

EPC stands for Engineering, Procurement, and Construction.

In a turnkey EPC arrangement, the scope generally covers the agreed engineering, equipment sourcing, and construction activities required to deliver the project. Additional services, such as approvals coordination, commissioning support, and maintenance, depend on the contract.

At GRE Renew Enertech Limited, the project process begins with understanding the customer’s requirements and evaluating the proposed site.

The work may then proceed through the following stages.

01

Customer discussion and feasibility

Understand the intended use of the plant, location, available land, proposed capacity, and commercial objectives.

 
02

Project planning and engineering

Develop the plant layout, equipment specifications, electrical design, and project execution plan.

 
03

Procurement and coordination

Plan material requirements, equipment procurement, project resources, and relevant project coordination activities.

 
04

Installation and construction

Carry out the agreed civil, structural, module installation, and electrical works.

 
05

Testing and commissioning

Complete applicable inspections, system testing, and commissioning activities before the plant is put into operation.

 
06

Operations and maintenance

Carry out agreed preventive maintenance, inspections, and performance monitoring to support plant operation.

The scope and responsibilities should be clearly documented in the EPC agreement. Timelines, equipment specifications, performance guarantees, testing procedures, and maintenance obligations should be based on the actual project contract.

Ground-mounted solar in Gujarat: What makes location important?

Gujarat has a substantial industrial base, with manufacturing and commercial activity spread across different industrial estates and business centres.

For companies in Ahmedabad, Sanand, Mehsana, Vadodara, Bharuch, Ankleshwar, Vapi, Rajkot, Morbi, and other industrial locations, ground-mounted solar can be explored as part of their energy planning.

However, two industrial units in the same district may have completely different project requirements.

One factory may have sufficient land near its premises and be interested in captive solar. Another may be exploring third-party power procurement. A landowner may be interested in developing a solar park but still need to establish grid connectivity and identify an appropriate power sale arrangement.

The project location influences land suitability, solar resource, grid access, evacuation infrastructure, applicable permissions, and development costs.

That is why a site-specific feasibility assessment is more useful than relying on a generic claim that every location is suitable for a solar power plant.

GRE Renew Enertech Limited, with its offices in Mehsana and Ahmedabad, works with ground-mounted solar EPC and solar park project requirements in Gujarat and other locations, subject to the project’s scope and feasibility.

 

How to choose a ground-mounted solar EPC company

Choosing an EPC partner is an important part of planning a solar project. Before finalising a company, businesses should understand its actual project experience, technical capabilities, contractual scope, and approach to execution.

A few practical questions are worth asking:

  • Has the company executed projects similar in size and application to the proposed plant?

  • Does the proposal clearly explain the equipment specifications and engineering scope?

  • Who is responsible for civil works, electrical infrastructure, testing, and commissioning?

  • What performance guarantees and warranty conditions are included in the agreement?

  • What operations and maintenance support is available after commissioning?

Reviewing actual project references and understanding the responsibilities under the EPC contract can help customers make an informed assessment.

GRE Renew Enertech Limited is a BSE SME-listed solar EPC company with its registered office in Mehsana and corporate office in Ahmedabad. Its ground-mounted solar offerings include captive solar, DISCOM power sale, third-party solar projects, and turnkey EPC services.

GRE Renew Enertech Limited, Businesses evaluating a ground-mounted solar power plant can contact GRE to discuss their requirements, proposed project location, and technical feasibility.

Frequently asked questions about ground-mounted solar

What is the cost of a ground-mounted solar power plant in India?

The cost depends on the proposed capacity, solar modules, inverters, mounting structures, civil works, electrical infrastructure, grid connectivity, and land development requirements. A project-specific EPC quotation should be prepared after assessing the site, technical specifications, and scope of work.

How much land is needed for a 1 MW ground-mounted solar plant?

The land requirement varies with the plant layout, module technology, terrain, spacing, access roads, and electrical infrastructure. A preliminary engineering layout is needed to estimate the usable land area for a particular project.

Can a factory use solar power generated at a separate location?

An eligible industrial consumer may be able to procure solar electricity from a separately located plant through an applicable captive or third-party open-access arrangement. Eligibility, ownership or consumption requirements, connectivity, and applicable charges must be assessed under the relevant regulations.

Can unused land be used for a solar power plant?

Potentially, yes. However, the land must be suitable for the proposed installation and meet the applicable land-use, ownership or lease, connectivity, and regulatory requirements. The intended electricity buyer or consumption arrangement also needs to be established.

What is the difference between a solar park and a solar power plant?

A solar power plant is a facility that generates electricity from solar energy. A solar park generally refers to a larger area or development intended to accommodate solar generation projects, potentially including common infrastructure. The exact structure and responsibilities depend on the development model.

Does GRE Renew Enertech Limited provide turnkey ground-mounted solar EPC services?

GRE provides ground-mounted solar EPC and project-related services, including engineering, procurement, installation, commissioning, and operations and maintenance according to the agreed project scope. Customers can share their proposed capacity, location, and project objectives for an initial discussion.

 Let’s discuss your ground-mounted solar project

Whether you are planning a captive solar power plant for your factory, exploring a third-party solar PPA, or considering the development of a solar park, the first step is understanding your requirements.